Buying Beach Villas}

February 1, 2017 By

Buying Beach Villas

by

William Marind

The transfer of the title can be effective once the Council of Ministers’ permission is obtained along with confirmation of receipt of the foreign funds. Upon transfer and registration in the purchasers name the district Land Registry Office will charge transfer fees which are based on the market value of the property at the time of purchase – as follows: Value up to CY50,000 – 3% CY50,001 – CY100,000 – 5% CY100,000+ – 8%

If there is a building on the plot you are buying, ask for the building permit in order to make sure that the structure is not illegal, as well as to ascertain the terms and conditions of the building.Please note that most of the above problems do not exist in case you buy a building site (as opposed to a plot of land/field). Even if the title deed registers the property as a building site, however, it is recommended that you go through the motions of checking the various prerequisites for development.

[youtube]http://www.youtube.com/watch?v=J9q3yA7x2oU[/youtube]

Cyprus is the lead nation that joined the European Union in 2004 which is another factor affecting the growth and prices in the property for sale market of Cyprus. It is expected that in the run-up to becoming a member of “the club”, prices of property for sale in Cyprus will continue to rise at an estimated growth rate of around 20% per annum.The climate of Cyprus makes the island one of the healthiest places in the world. With 340 days of bright sunshine annually.

In addition a 1.5%-2% is payable for the structural design and 0.3% for structural supervision. If you are at a loss as to the choice of a suitable consultant, seek the advice of the Registrar of the Association of Architects & Engineers (all licenced architects must be registered). Please bear in mind that in case of large buildings you may be able to negotiate a lower fee (as also in the case of repetitive work).

In case you require air condition ing/central heating, we suggest that the advice of a qualified electrical and mechanical engineer be sought. Fees for this consultant are around 4% for the design and 2% for supervision (on the cost of the works).Insist on all drawings being ready before inviting tenders.It is recommended that a building permit be secured first before works commence, although works such as excavations etc may begin prior to the issue of the building permit. In this case, your architect must consult with the Appropriate Authority to see whether there are any major objections to the drawings.

Discover the secrets to

beach villa cyprus

. Grab your free guide now and save yourself time, money and stress. Don’t get ripped off, get your

turkey real estate

report.

Article Source:

eArticlesOnline.com

}